Type S Form Deck: Planning Repeated Floor Pours
Repeated floor layouts can make a deck order appear straightforward, but a small coordination error can repeat across many levels. For projects that specify Type S form deck, procurement should follow the approved floor system and the contractor's planned pour sequence.
Confirm the selected floor system
Type S form deck has a shallow profile. Its use on a particular building depends on the design, including support conditions and construction-stage loading. Building height alone does not determine whether it is suitable.
Keep form deck and composite floor deck distinct in submittals. An approved form-deck slab may rely on reinforcement and support details that differ from those of a composite deck-slab system. A substitution should go through the engineer, not be resolved by matching sheet coverage.
Coordinate level by level
Review stair openings, elevator cores, risers, balconies, and perimeter changes before copying a takeoff to the next floor. Even a typical level may have local differences at mechanical floors or transfer areas. Identify those exceptions on the release drawings and bundle labels.
Discuss how materials will reach the work area. Hoisting windows, laydown space, and the number of bundles needed for each pour can affect the release sequence. Storage and distribution arrangements should be settled by the construction team before shipment.
Release checklist
- Current structural plan and slab details for each level.
- Approved deck thickness, coating, and panel lengths.
- Specified temporary-support requirements and responsibility for them.
- Opening and edge details coordinated with other trades.
- A delivery schedule linked to actual installation areas.
Consult the SDI standards resources for the applicable technical documents. The project's reviewed design remains the basis for installation.
Send your floor plans to Miami Metal Deck for a material quote organized around the specified profile and release sequence.