What Does Type B Roof Decking Cost per Square Foot in Florida?

There is no reliable average, because Type B roof deck cost per square foot moves with gauge, coating (G60, G90 or painted), sheet lengths, total quantity, the current steel market and freight to your site. Heavier gauges carry more steel per square foot, so they cost more. The accurate number comes from your plans: we run a takeoff and quote delivered pricing anywhere in Florida.

What drives the price per square foot

  • Gauge: steel weight runs from 1.6 psf at 22 ga to 3.0 psf at 16 ga, so 16 ga uses nearly twice the steel of 22 ga.
  • Coating: G90 carries more zinc than G60; painted or vented deck adds processing.
  • Lengths and waste: cut lengths that match the framing reduce scrap and laps.
  • Quantity and the steel market at the time of order.
  • Freight and delivery distance, plus any accessories such as sump pans and Tek screws.

Material cost vs installed cost

A deck supply quote covers material and delivery. Installed cost adds the erection crew, crane or lift time, welding or screw fastening, sidelap fastening and site access. Keep the two separate when you compare bids so you are comparing like with like.

Getting a real number

Send your roof framing plans, deck schedule and specs. Our takeoff service produces an optimized cutting list, and the quote reflects your exact gauges, coating and lengths with delivery to your jobsite.

Type B steel weight per square foot of coverage (MMD catalog)

GaugeDesign thickness (in)Weight (psf)
220.02951.6
200.03582.0
180.04742.6
160.05983.0

Related Questions

Why do suppliers not publish a price per square foot?

Steel deck pricing tracks the steel market and depends on gauge, coating, lengths, quantity and freight for each job. A posted number would be wrong for most projects. A quote built from your plans reflects what you actually need, including waste and accessories, which makes it useful for bidding.

Does a lighter gauge always lower the cost?

It lowers the steel per square foot, but the deck still has to meet the spans and loads the engineer designed for. A lighter gauge that cannot span the joist spacing is not an option. The gauge comes from the structural drawings, and we price what the drawings call for.