How Does Composite Deck Speed Up Tower Construction?

Composite deck speeds up residential towers because it serves as both the concrete form and the positive slab reinforcement. Crews lay and fasten sheets, place concrete and move up, with no forms to strip and often less shoring. It also gives a working platform right away. We supply 1.5", 2" and 3" composite deck cut to length for Florida towers.

Where the Time Savings Come From

  • No formwork to build, strip and move to the next level
  • Embossed ribs bond with concrete, so the deck replaces bottom reinforcing in the design
  • Sheets 36" wide (1.5" and 2" profiles) cover area quickly
  • Deeper 2" and 3" profiles can span farther between beams, often without shoring
  • Installed deck becomes a working platform and overhead protection for trades below

Keeping the Floor Cycle Moving

Repetitive tower floors benefit most from a clean supply plan: one takeoff, shop drawings that tag every sheet, and deliveries sequenced by level so the crane lifts bundles straight to the floor being decked. Order pour stop, hanger tabs (20ga and heavier) and closures with the deck.

Send the structural set and we will prepare a takeoff, cutting list and quote for the whole tower.

Related Questions

Does composite deck eliminate shoring?

Not always. Whether deck can be placed unshored depends on profile, gauge, span and the wet concrete weight. Deeper profiles and heavier gauges span farther. The engineer of record determines whether shoring is required and where. Where shoring is needed, the drawings show it, and we can quote alternate gauges for comparison.

Can bundles be tagged by floor?

Our shop drawings and cutting lists identify each sheet's location. Talk to us about bundling and labeling by level or area so crews can lift and install without sorting on the deck. Clear labeling saves crane time and keeps the right gauge in the right bay on every level of the tower.