How Do You Source Deck for Multi-Unit Housing?

Multi-unit housing usually needs composite floor deck for the elevated floors and roof deck on top, often with joists or purlins. A reliable supply plan starts from one takeoff, then releases material by building or floor so each delivery matches the pour sequence. We prepare the takeoff, cut sheets to length and deliver across Florida.

Typical Materials on Apartment and Condo Jobs

  • 1.5", 2" or 3" composite floor deck, 22 to 16ga, 50 ksi, G60 or G90
  • 1.5" Type B roof deck, or 3" Type N where the roof spans exceed Type B limits
  • Form deck for stair landings, balconies or other non-composite slabs
  • Steel joists and C or Z purlins for roof and canopy framing
  • Pour stop, closures, sump pans and Tek screws, ordered with the deck

What Keeps Supply Predictable

Repeated floor plans are an advantage: once the first level is detailed, the cutting list repeats and later releases are simple to confirm. Give us the full set early, flag phasing and laydown limits, and confirm each release against the latest revisions.

Shop drawings tie every sheet to a bay, which helps crews and inspectors. Send the plans for a building-by-building takeoff and quote.

Related Questions

Can deliveries be split by building or phase?

Yes. Large housing jobs are commonly released in phases. We align the cutting list with your phasing so each delivery carries only the sheets and accessories for that building or floor, which reduces handling and site storage. Confirm the release sequence with us when you place the order.

Which composite deck depth suits apartment floors?

It depends on beam spacing, slab thickness, loads and the fire-rated assembly. 1.5" deck suits shorter spans, while 2" and 3" profiles reach farther between beams. Your structural engineer selects the profile and gauge, and we supply it cut to length.